Assigning Resources
Learn how to allocate resources to tasks and plans in YAPL.
Assigning Resources
Resource assignment connects your workspace resources to specific tasks and plans, enabling tracking of utilization, costs, and availability.
Understanding Resource Assignment
Assignment involves:
- Selecting resources from your workspace pool
- Specifying allocation (quantity, duration, dates)
- Tracking usage against availability
- Calculating costs based on rates and allocation
Where to Assign Resources
Plan Resources Tab
- Open a plan
- Navigate to Resources tab
- Manage plan-level resource assignments
Task Resources
- Open a task
- Find resources section
- Add or modify task resource assignments
Timeline View (Gantt)
- Open plan timeline
- View resource assignments visually
- Drag to modify assignments
Assigning to Tasks
Step-by-Step
- Open the task
- Find Resources section
- Click Add Resource
- Search or browse available resources
- Select the resource
- Configure allocation:
- Quantity (for materials/consumables)
- Duration/hours (for equipment)
- Dates (if different from task dates)
- Save assignment
Assignment Fields
| Field | Description | Applies To |
|---|---|---|
| Resource | Selected resource | All |
| Quantity | Units needed | Materials, Consumables |
| Hours | Time allocated | Equipment |
| Days | Days allocated | Equipment |
| Start Date | When needed | All |
| End Date | Until when | All |
| Notes | Assignment details | All |
Equipment Assignment
Time-Based Allocation
Equipment uses time-based assignment:
| Field | Description | Example |
|---|---|---|
| Hours | Operating hours needed | 16 hours |
| Days | Calendar days needed | 2 days |
| Start | When equipment needed | 2025-01-15 |
| End | When released | 2025-01-16 |
Cost Calculation
Equipment costs calculated as:
- Hourly: Hours × Hourly Rate
- Daily: Days × Daily Rate
System uses the appropriate rate based on allocation type.
Material Assignment
Quantity-Based Allocation
Materials use quantity assignment:
| Field | Description | Example |
|---|---|---|
| Quantity | Units needed | 50 cubic yards |
| Unit | Measurement unit | cubic yards |
Cost Calculation
Material costs calculated as:
- Quantity × Unit Cost
Consumable Assignment
Quantity-Based Allocation
Similar to materials:
| Field | Description | Example |
|---|---|---|
| Quantity | Units needed | 25 each |
| Unit | Package unit | each |
Cost Calculation
Consumable costs calculated as:
- Quantity × Unit Cost
Modifying Assignments
Editing Assignment
- Find the assignment in task or plan
- Click edit icon or assignment details
- Modify quantity, hours, or dates
- Save changes
Removing Assignment
- Find the assignment
- Click remove/delete icon
- Confirm removal
- Resource returns to available pool
Bulk Assignment
Assigning Multiple Resources
- Select task or plan
- Click Add Resources (plural)
- Select multiple resources
- Configure each allocation
- Save all assignments
Assigning Resource Groups
If using groups:
- Select entire group
- All group resources assigned
- Configure individual allocations as needed
Assignment Conflicts
What Are Conflicts?
Conflicts occur when:
- Equipment double-booked on same dates
- Resource over-allocated beyond capacity
- Scheduling overlaps detected
Conflict Indicators
YAPL shows:
- Warning icons on conflicted resources
- Conflict messages in assignment dialog
- Utilization over 100%
Resolving Conflicts
Options:
- Adjust dates to avoid overlap
- Reduce allocation quantity/hours
- Use alternative resource
- Accept and document over-allocation
Conflicts don't prevent assignment but indicate potential scheduling issues.
Assignment from Gantt Chart
Visual Assignment
- Open plan timeline (Gantt)
- View resource row under tasks
- Drag resource bars to allocate
- Resize bars to adjust duration
Benefits
- Visual scheduling
- Easy conflict identification
- Quick adjustments
Cost Tracking
Viewing Assignment Costs
Each assignment shows:
- Resource rate
- Allocation quantity/time
- Calculated cost
Aggregated Costs
Plan and task views show:
- Total resource cost
- Cost by resource type
- Budget comparison
Full cost tracking requires Professional tier subscription.
Assignment Status
Planned
- Future assignment
- Resource reserved
- Not yet used
Active
- Currently in use
- Within assignment dates
- Being consumed/utilized
Completed
- Past assignment
- Actual usage recorded
- Costs finalized
Best Practices
Planning Ahead
- Assign resources early in planning
- Allow buffer for uncertainties
- Review availability before assigning
Accurate Allocation
- Use realistic quantities/hours
- Update as scope changes
- Track actual vs. planned
Conflict Management
- Address conflicts promptly
- Document resolution decisions
- Consider alternative resources
Cost Accuracy
- Keep resource rates current
- Update allocations as needed
- Review costs regularly
Subscription Requirements
| Feature | Basic | Professional |
|---|---|---|
| Basic assignment | Yes | Yes |
| Conflict detection | No | Yes |
| Cost tracking | No | Yes |
| Group assignment | No | Yes |
Troubleshooting
Cannot Assign Resource
"Resource not available"
- Check resource is active
- Verify not already fully allocated
- Check subscription limits
"Conflict detected"
- Review existing assignments
- Adjust dates or allocation
- Use alternative resource
Cost Not Calculating
- Verify resource has rate set
- Check allocation fields are filled
- Ensure Professional tier
Assignment Not Saving
- Check all required fields
- Verify permissions
- Refresh and retry
Related Topics
- Creating Resources - Add resources
- Resource Groups - Group management
- Resource Utilization - Track usage
- Task Management - Task operations