Projects FAQ
Frequently asked questions about projects, plans, and tasks in YAPL.
Projects FAQ
Common questions about creating projects, managing plans, and working with tasks.
Project Basics
What is a project in YAPL?
A project is the main organizational unit containing:
- Basic information (name, code, description)
- Timeline (start and end dates)
- Budget (optional)
- Team assignments
- Plans (schedules with tasks)
What's the difference between a project and a plan?
| Concept | Description |
|---|---|
| Project | Container for work - has budget, timeline, team access |
| Plan | Schedule within a project - has tasks, dependencies, resources |
One project can have multiple plans (e.g., baseline plan, revised plan, scenarios).
How many projects can I have?
| Tier | Active Project Limit |
|---|---|
| Trial | 1 |
| Basic | 5 |
| Professional | Unlimited |
"Active" means Planning, Active, or On Hold status. Completed, Cancelled, and Archived don't count toward your limit.
Creating Projects
Do I need a team before creating a project?
- Workspace owners: Can create projects without teams
- Everyone else: Must assign at least one team
What information is required to create a project?
Minimum requirements:
- Team assignment (for non-owners)
- Project name (3-255 characters)
Everything else (description, dates, budget) is optional.
What's a project code?
A unique identifier for your project, automatically generated based on workspace settings:
- Format: PREFIX-YEAR-SEQUENCE (e.g.,
PROJ-25-001) - Customizable during creation
- Must be unique within workspace
Project Status
What project statuses are available?
| Status | Description |
|---|---|
| Planning | Initial setup (default for new projects) |
| Active | Work in progress |
| On Hold | Temporarily paused |
| Completed | Work finished |
| Cancelled | Project terminated (won't proceed) |
Note: Archiving is a separate operation (soft-delete), not a status. See "Archiving" section below.
Can I change a project's status?
Yes. The allowed transitions are:
- Planning → Active, Cancelled
- Active → On Hold, Completed, Cancelled
- On Hold → Active, Cancelled
- Completed → (terminal, no further changes)
- Cancelled → (terminal, no further changes)
Why can't I put my project "On Hold"?
Only Active projects can be put on hold. If your project is in Planning status, change it to Active first.
Do completed projects count toward my limit?
No. Only Planning, Active, and On Hold projects count toward your limit. Complete, cancel, or archive projects to free up space.
Project Access
Who can see my projects?
- Workspace owners: Can see all projects
- Team members: Can see projects their team is assigned to
How do I give someone access to a project?
Add their team to the project:
- Open the project
- Go to team assignment settings
- Add the team
- Save changes
Or add them to a team already assigned to the project.
Can I share a project with another workspace?
No. Projects are workspace-specific. Each workspace is completely isolated.
Why can't some team members edit the project?
Check their team role:
- Lead/Member: Can edit
- Viewer: Read-only access
Plans
How many plans can I have?
Plans are counted at the workspace level, not per project.
| Tier | Plans per Workspace |
|---|---|
| Trial | 1 |
| Basic | 10 |
| Professional | Unlimited |
What's the difference between personal and project plans?
- Project plans: Associated with a project, team access applies
- Personal plans: Standalone, only you can access (unless assigned to project)
Can I move a plan to a different project?
Plans can be assigned to projects via the plan assignments feature. You can change or remove project associations.
Tasks
How many tasks can I have per plan?
| Tier | Tasks per Plan |
|---|---|
| Trial | 200 |
| Basic | 200 |
| Professional | 500 |
What's a WBS code?
Work Breakdown Structure (WBS) codes identify tasks in a hierarchy:
1- First level task1.1- Subtask of task 11.1.1- Sub-subtask
WBS codes help organize and reference tasks.
Can I have subtasks?
Yes! Tasks can have child tasks (subtasks) to any depth. This creates a hierarchical work breakdown structure.
What task statuses are available?
Default statuses:
- To Do - Not started
- In Progress - Active work
- In Review - Pending approval
- Completed - Finished
Workspaces can add custom statuses.
Budget & Cost
Is budget tracking available on all plans?
- Basic: No cost tracking
- Professional: Full cost tracking features
What currency options are available?
Any ISO 4217 currency code (USD, EUR, TRY, GBP, etc.). The workspace default currency can be set in organization settings.
Where do I see project budget status?
Open your project and view the overview/dashboard. Budget metrics show:
- Total budget
- Spent amount
- Remaining budget
- Usage percentage
Timeline
Do I need to set project dates?
No, dates are optional. However, having dates enables:
- Timeline progress tracking
- Duration calculations
- Gantt chart visualization
What happens if my end date is before the start date?
You'll get a validation error. The end date must be after the start date when both are specified.
Archiving
What does archiving a project do?
Archiving is a soft-delete operation (separate from status changes):
- Hides the project from default lists
- Frees up project limit quota
- Preserves all data for reference
- Can be viewed with "Show Archived" filter
Can I restore an archived project?
Yes, archived projects can be restored by workspace owners. Contact your workspace owner if you need to restore an archived project.
What's the difference between Cancelled and Archived?
| Cancelled | Archived | |
|---|---|---|
| What is it | A project status | A soft-delete operation |
| Meaning | Project won't proceed | Project stored for records |
| Reversible | No (terminal status) | Yes (can restore) |
| Use when | Client cancelled, project terminated | Completed work needs storage |
How long are archived projects kept?
Retention varies by tier. Contact support for specific retention policies.
Troubleshooting
I hit my project limit but don't have many active projects
Check that you're counting correctly:
- Planning, Active, On Hold = counts toward limit
- Completed, Cancelled, Archived = doesn't count
Complete, cancel, or archive older projects to free space.
My project disappeared
It might be:
- Archived (check filter settings)
- Team assignment changed
- Deleted by workspace owner
I can't edit my project
Check your access:
- Team role must be Lead or Member
- Project must not be archived
- You must be on an assigned team
Still Have Questions?
Contact Support for help with projects.
Was this page helpful?