Plan Assignments
Connect plans to projects in YAPL.
Plan Assignments
Plan assignments connect plans to projects, controlling access and integrating plans into project metrics and reporting.
Understanding Assignments
Plan assignments determine:
- Which project the plan belongs to
- Who can access the plan (via project teams)
- Where it appears in navigation and reports
- How metrics combine with project data
Assignment Types
Project-Assigned Plans
Plans linked to a specific project:
- Created from project context
- Inherit project team access
- Appear in project's plan list
- Part of project metrics
Standalone Plans
Plans without project assignment:
- Created independently
- Workspace-level access
- Personal or shared planning
- Can be assigned later
Assigning Plans to Projects
During Plan Creation
When creating from project context:
- Open project
- Navigate to Plans
- Create Plan
- Automatically assigned to project
After Creation
Assign existing plan to project:
- Open the plan
- Navigate to Assignments tab
- Click Assign to Project
- Select project from list
- Confirm assignment
Viewing Assignments
From Plan
- Open the plan
- Navigate to Assignments tab
- View connected projects
From Project
- Open project
- View Plans tab or section
- See all assigned plans
Assignment Effects
Access Control
When assigned to a project:
| Who | Access |
|---|---|
| Project team members | Based on team role |
| Non-project members | No access |
| Workspace owners | Full access |
Metrics Integration
Assigned plans contribute to project:
- Task completion statistics
- Timeline metrics
- Budget tracking (if enabled)
- Progress reporting
Navigation
Assigned plans appear:
- In project's plan list
- Project metrics dashboard
- Project reports
Removing Assignments
When to Remove
Remove assignment when:
- Plan no longer relevant to project
- Moving to different project
- Converting to standalone
How to Remove
- Open the plan
- Navigate to Assignments tab
- Find the assignment
- Click Remove or unlink option
- Confirm removal
Removal Effects
After removing:
- Plan becomes standalone
- Access changes to workspace-level
- Removed from project metrics
- Historical data preserved
Multiple Project Assignments
Single vs. Multiple
Plans typically have one project assignment:
- Clear ownership
- Straightforward access
- Simple metrics
Shared Plans
If plan serves multiple projects:
- Consider multiple project assignment
- Or use standalone with explicit sharing
- Metrics may be shared
Reassigning Plans
Moving Between Projects
To move a plan to different project:
- Remove current assignment
- Add new project assignment
- Access updates immediately
Considerations
Before reassigning:
- New project team gains access
- Old project loses the plan
- Metrics shift to new project
Standalone Plan Uses
When to Use Standalone
- Personal planning workspace
- Cross-project planning
- Templates (copy to projects)
- External consultant work
Converting to Assigned
Any standalone plan can be assigned:
- Open plan
- Go to Assignments
- Select project
- Plan joins project
Access Implications
Project Assignment Controls Access
| Plan Status | Access Via |
|---|---|
| Assigned | Project team membership |
| Standalone | Workspace membership |
Team Role Impact
For assigned plans, team role determines:
- Lead: Full access
- Member: Edit access
- Viewer: View only
Best Practices
Clear Assignment
- Assign to one primary project
- Document if shared
- Review assignments periodically
Planning Workflow
- Create standalone for initial drafting
- Assign to project when ready
- Access automatically managed
Organization
- Don't leave orphaned standalone plans
- Clean up unneeded assignments
- Use descriptive plan names
Troubleshooting
Cannot Assign Plan
"You don't have permission"
- Need project edit access
- Verify team role in target project
"Project not found"
- Verify project exists
- Check your project access
Assignment Not Working
- Refresh the page
- Check for conflicts
- Verify save completed
Lost Access After Change
- Check project team membership
- Verify assignment is correct
- Contact workspace owner